PROJECT NAME
The Evergreen Development
The Evergreen Development project represents a significant opportunity to showcase how engineering acumen can be harnessed to resolve complex land development issues. As a sprawling enterprise stretched across 127 acres with a plan to house 295 lots at a density of 2.5 dwelling units per acre, the project’s aspirations are as lofty as the challenges are concrete.
Project Vision and Challenges
The Evergreen Development project seeks to achieve a harmonious balance between land development and natural conservation. The site’s sloped surfaces and the goal of attaining balanced earthwork volumes without the reliance on retention ponds set the stage for a challenging yet innovative project.

Sewer Connection on Weak Soil
One of the main challenges arises from the need to establish a connection to the existing sewer system. The connection point lies on weak soil within a wetland area, which presents significant construction challenges due to the delicate nature of the environment.
CHALLENGE 1
Complex Terrain Management
The terrain is characterized by numerous gullies and a pronounced slope on one side. This topography necessitates careful management of water flow to prevent erosion and ensure effective drainage across the development.
CHALLENGE 2